 Cold air return is one of the   most important parts of the finished basement project. The main goal  of  the cold air return installation is to make air circulation. In the   winter time it will remove cool air off the floor and help replace it   with warm air from the supply registers, in the summer time it will   remove moisture and create a healthy environment. 
 Double cold air returns   are necessary to use in large basements or in basements with a big open   space. If basement has bedrooms it would be a good idea to have a cold   air return for each room, otherwise one double cold air return would be   more than enough.
 
 Of course, if you have a zoning system where   one zone works only for the basement you might need more returns, but  in  the basement it’s always a good idea to have less cold air returns  than  supplies!
 If you found your way to this page I can assume that most   likely you are interested in the double cold air return installation.   Some of the visitors of my website already purchased an access to the   paid page and I’m not surprised why. Recently I've spent more than an   hour looking for DIY information on how to install a cold air return in   general and a double return in particular, but didn’t find anything! I   dug through hundreds of websites and found out that only my website can   give you a comprehensive step-by-step explanation with pictures of   installation, tools and materials!
 
 Installation on the paid   page might not exactly describe your upcoming project. However, it will   give you an important example of how this type of installation should  be  done. In addition, it will open the gates for as many questions as   necessary to make sure that the job is done right.
 
 Double Cold Air Return Installation
 If in your finished basement, you have a big open area you may use so called Double Cold Air Return:
 
 List of materials needed for the project:
 10” drives                           10” S-cleats                       10” x 8” End Cap    
     
  10” x 8” Duct                     8” Collar                                 Floor Angle     
               Single Sheeting           30” x 6” Cold Air Frame              8” Elbow                                                                     
   8” Pipe                                8” Damper                                              List of tools needed for the project:       
               Cordless Drill        Replaceable-blade Snips              Tape Measure          Red Snips        
              Green snips                                                                                    Crimpier                           12” Folder              Scratch Awl       
 Drywall Saw              Hand Simmers           Flat Screwdriver                Magic Marker 
         Hammer 
 In order to better organize an explanation of the execution   of this project I would like to divide it into several steps:
 
 Step 1- Making a box from a 10” x 8” duct:
 
 Double cold air return got this name because it’s using two stud spaces. As we know the distance between two studs on center is 16”. However you can’t just rely on this    knowledge, you must take a measurement first. So, here we go:...
 
 In order to gain access to the secondary  pages you have to pay an access fee of $2.00 for installation in  pictures or $2.50 for installation in pictures with explanations. Just  click on one of the “Buy Now” buttons below. Once you pay, you will gain an instant access to the page!   Instant AccessAfter  you purchased a paid  page, a PayPal is going to bring you back to my  website. In order to  see the paid page you have to click on the “Register” button, fill out a form, chose your own Username and Password and click on “Register” button at the bottom of the form again – congratulation, you are now on the page you have paid for! |